Pressurisation Systems

Air-movement equipment and project inputs for staircase, lobby and protected-space pressurisation strategies.

Where pressurisation systems fit

Pressurisation is a system duty, not a fan-only claim. The required airflow depends on leakage paths, door conditions, building geometry, control logic and the project fire strategy. RAFAVENT reviews fan requirements within the submitted design basis.

Duty pointAirflow + pressure
EnvironmentTemperature + medium
InstallationSpace + connection
ControlSupply + speed strategy

Preliminary engineering selection data

Calculated ranges for early model selection. Final duty, dimensions and materials are confirmed against the project requirement.

RAFAVENT Engineering Calculation — Preliminary Selection — Non-Certified
ModelSize / connectionAirflow m³/hStatic pressure PaSpeed rpmMotor kWSupplyEst. dB(A) @ 3 mConstructionInstallationTypical applicationSelection note
PR-500Package4,000–8,000300–600VFD3–5.53Ph65Fan, VFD, pressure sensor and control panel packagePlant room or roofStair, lobby and protected-space pressurisationLeakage, door force and fire strategy must be calculated per project.
PR-800Package15,000–30,000400–900VFD18.5–373Ph79Fan, VFD, pressure sensor and control panel packagePlant room or roofStair, lobby and protected-space pressurisationLeakage, door force and fire strategy must be calculated per project.

RAFAVENT Engineering Calculation — Preliminary Selection — Non-Certified
These values are engineering calculations, not AMCA/ISO certified ratings. Smoke, fire, temperature and hazardous-area certification applies only when supported by project-specific evidence.

Staircase pressurisation

Fan selection inputs for protected escape stair strategies.

Lobby and refuge areas

Air supply duties for spaces defined by the project fire and smoke strategy.

System integration

Coordination with ducts, dampers, controls, standby power and pressure sensing.

Information required for selection

Engineering and supply workflow

1. Share requirements — Send the duty point, operating conditions, drawings or BOQ.
2. Engineering review — RAFAVENT reviews the application and identifies missing selection data.
3. Technical proposal — Receive a project-specific configuration and commercial response.
4. Supply and support — Documentation and project coordination continue through the agreed supply scope.

Documentation note: Compliance or life-safety performance is not claimed without the approved system design, calculations, controls and documented equipment capability.